Emissions Monitoring & Regulatory Compliance Support

Perspectum supports operators, municipalities, and environmental teams with field inspection, measurement, and documentation programs configured around applicable emissions requirements. Our work can combine aerial screening, OGI and LDAR inspection, methane measurement, repeat inspections, mapped findings, and project reporting. For municipal solid waste programs, see our landfill methane monitoring services. The governing rule, approved method, inspection frequency, reporting format, and jurisdiction should be confirmed before mobilization.

FIELD-READY COMPLIANCE

From Regulatory Requirements to Field Execution

We translate defined monitoring obligations into practical aerial and ground inspection scopes, with clear deliverables and documented follow-up where required.

01 / OPERATOR INPUTS

Define the Requirement

Confirm the applicable regulation or approved alternative, affected assets, monitoring schedule, accepted instruments, inspection method, and required reporting records.

02 / PERSPECTUM FIELD SCOPE

Plan the Inspection

Define aerial or ground activities, sensor and instrument selection, Geographic Information System (GIS) asset references, mapped findings, and the agreed reporting package.

Screening is not quantification or compliance certification. Source localization, measurement, and repair verification are separate scope items. See our Pine Cliff Energy field program or the landfill survey preparation checklist for project examples and planning resources.

CANADIAN REGULATORY FRAMEWORK

  • Alberta Energy Regulator — Directive 060
    The current edition of Directive 060 was released and became effective March 27, 2026. It sets requirements for flaring, incinerating, venting, and related upstream petroleum activities in Alberta.
  • British Columbia Energy Regulator — Methane Emissions Requirements
    BCER methane regulations address primary upstream oil and gas sources including equipment leaks, pneumatic devices, compressor seals, glycol dehydrators, storage tanks, and surface casing vents. Amended requirements were phased in from 2024 and 2025.
  • Saskatchewan Oil and Gas Emissions Management
    Project scopes should be reviewed against current Saskatchewan methane, flaring, venting, measurement, and reporting requirements before field work begins.
  • Federal Enhanced Methane Regulations — Onshore Oil & Gas
    Canada finalized enhanced methane regulations in December 2025 for onshore oil and gas production, processing, and transmission. Key new compliance dates begin January 1, 2028, subject to applicable equivalency arrangements.
  • Canadian Landfill Methane Regulations
    Canada finalized the Landfill Methane Regulations in December 2025. The regulations apply to qualifying landfills receiving municipal solid waste and establish requirements including surface methane concentration limits, regular monitoring, and equipment leak monitoring.

UNITED STATES REGULATORY FRAMEWORK

  • Bureau of Land Management Venting & Flaring Requirements
    Additional requirements may apply to oil and gas operations on federal and Tribal leases. Confirm the current rule and project applicability before field execution.

Discuss Your Compliance-Monitoring Scope